10 rezultata pretrage za WA 0812 2782 5310 RAB Railing Tangga Stainless Kaca Per Meter Pringapus Kab Semarang
-
45,596 45,408 44,509 44,359 43,944 45,211 47,271 49,913 52,718 55,604 50,225 GDP per...increase by 10.8% in 2021, after contracting by as much as 8.1% in 2020, and to...
Jan 31, 2022 10:21 AM
-
The change in the balance is the per- centage change in comparison with the balance...Assets per Employee million kuna 0 10 2 12 4 6 8 ...
Jun 30, 2015 4:03 PM
-
–6 –4 –2 6 0 2 4 82 86 90 94 98 102 106 Figure 4.6 Compensation per...According to the national accounts data, compensation per...
Dec 10, 2019 2:57 PM
-
commitment to structural re- forms depends on initial conditions (in terms of the GDP per...literature, is initial conditions (INITIAL), measured here as the log of the...
Jul 4, 2015 4:29 PM
-
The price of Brent crude oil per barrel dropped from USD 52.7 at end-March to USD...The unit labour cost is calculated as the ratio between compensation...
Jun 21, 2017 9:01 AM
-
We define labour productivity as real value added per em- ployee in thousands of...3 Table 2 Proportion of exporters in the total number of firms in the sample...
Oct 9, 2018 11:18 AM
-
addition, domestic inflationary pressures that arose from the strengthening of per...The unit labour cost is calculated as the ratio between compensation...
Jan 27, 2017 4:15 PM
-
lower than transaction- based growth, primarily as a consequence of the sale of non-per...The unit labour cost is calculated as the ratio between compensation...
Mar 3, 2020 10:17 AM
-
spreads on loans and deposits remained at almost the same level as in July (4.39 per...The unit labour cost is calculated as the ratio between compensation...
Oct 16, 2019 8:51 AM
-
‘Losses due to fraud per liability bearer‘ refers to the losses by the reporting...with Data Breakdowns A to F in Annex 2 should report all losses due to fraud...
Apr 6, 2020 12:20 PM