5 rezultata pretrage za WA 0812 2782 5310 Biaya Borongan Memasang Karpet Vinyl Rumah Kluster 1 Tingkat Klaten
-
increased by HRK 5.4bn or 1.8%, reaching HRK 296.5 at the end of the month (Table 1)...effects of exchange rate changes), as compared to the 3.4% a month earlier (Figure...
Jul 25, 2017 10:09 AM
-
(0.4%) in December 2017, standing at HRK 307.2bn at the end of the month (Table 1)...similar to that in the previous month (exchange rate changes excluded) (Figure...
Jan 23, 2018 9:14 AM
-
increased by HRK 3.9bn (1.2%) and at the end of the month stood at HRK 323.3bn (Table 1)...liquid assets (M4) accelerated in June 2019 to 4.6%, based on transactions...
Jul 31, 2019 10:29 AM
-
HRK 0.9bn (0.3%), having reached HRK 291.1bn as at the end of the month (Table 1)...The M4 annual growth has been decelerating since early 2017 (Figure...
Jun 28, 2017 9:55 AM
-
Total liquid assets (M4[1]) decreased in September, by HRK 2.2bn or 0.5% (Table 1...transactions), while the rise in M4 slowed down only slightly,...
Oct 31, 2022 7:53 AM